In this article you will learn how to set up a 5-10-5 test
1. Position the Ledsreact Pro on the surface or on the tripod lowest stand
2. Position the Ledsreact Pro with NR1 towards the start
3. Position the starting line
- The starting line must be measured from the front of the Ledsreact Pro
- Position a cone on the starting point 3M or 10ft away from the Ledsreact Pro
4. Position the turning points left and right
- Position a red cone 5M or 5Y on the left side of starting point to indicate the turning point Left
- Position a green cone 5M or 5Y on the right side of starting point to indicate the turning point right
Image of the set up in meters
Image set up in Yard